Projects

Highway Taunsa

COST: 866.76 MILLIONS

01

Dera Ghazi Khan

Rehabilitation Of Road From Pull
Qambar (N-55) To Head Taunsa
Barrage Length 12.50 Km, Tehsil
Taunsa District D.g.khan (Adp
No.1812 For The Year 2024-25)

Al Rehmat Jv Sadaqat Builders

COST: 806.399 MILLIONS

02

World Bank Scheme Under Prmc

PK-LG&CD-374255-CWRFB)Procurement of Civil Works, SouthIII, Tehsil Taunsa (Village Dona & Sonra) Procurement of Civil Works for the development of Model Village (Dona & Sonra), Tehsil Taunsa. The project scope includes the construction of a comprehensive road network, water supply tanks for clean water storage, and paved footpaths to enhance pedestrian mobility and village infrastructure.

Package Road

COST: 206.587 MILLIONS

03

C.M Taunsa Package Road

C.M taunsa package road component for 2018-19 rehabilitation of metalled road Zain to barthi including pile foundation Bridge length 16.00 km (group-ll: km no 10.00 to 16.00 length : 06.00 km) district D.G Khan

Tribal Area Development

COST: 118.634 MILLIONS

04

Tribal Area Development Project 2018-19

Construction of approach metalled roads Length: 7.00 km district d.G Khan.

1) construction of metalled road mumdani Tak length = 2.00 km
2) construction of metalled road barthi tak Length = 2.00 km
3) construction of metalled road hathi mar Tak length=2.00 km
4) construction of metalled road for zain Tak (noorghani) length = 1km